-
Type: Bug
-
Status: Resolved (View Workflow)
-
Priority: Critical
-
Resolution: Unresolved
-
Affects Version/s: None
-
Fix Version/s: None
-
Component/s: None
-
Labels:
-
Epic Link:
-
Sprint:Blackbird Sprint 6 (Mar 1-15)
When using Null provider with intents re-route test, no intent events can be triggered from the re-route event (i.e. cutting the shortest path in a triangle topology).
1) set up a triangle links tin topology;
2) push-test-inntents without withdraw; verify intents in INSTALLED state;
3) record timestamps in intent-events-metrics
3) cut the shortest path in Null provider and see the topology changed;
4) check intent-events-metrics again; but no timestamp and event changes.