Uploaded image for project: 'ONOS'
  1. ONOS
  2. ONOS-4553

Intents that cannot be satisfied bounce between WITHDRAWING and FAILED states, which causes other intents being rerouted stuck in INSTALLING state

    XMLWordPrintable

    Details

    • Type: Bug
    • Status: Closed (View Workflow)
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: 1.6.0
    • Component/s: None
    • Labels:
    • Story Points:
      3
    • Epic Link:
    • Sprint:
      Goldeneye Black Sprint #3, Goldeneye Black Sprint #4

      Description

      When some installed intents cannot be satisfied ( e.g. intents to/from one device which is either brought down or isolated from the rest of the topology by link-down), they bounce between withdrawing and failed state.

      More importantly, sometimes this issue is causing other intents that can be rerouted stuck in installing state for a long time.

      For instance, in a 10-node ring topology, when we install 10 intents which pass switch s1 (we call intent set A) and then bring down s1, the intents can be rerouted quickly. However, if we pre-install some other intents to/from s1 (intent set B), after s1 is down, states of intent set B will become unstable and intent set A cannot be rerouted for minutes or even longer.

      In addition, when this happens, most of the time the intent states are inconsistent among onos nodes.

        Attachments

          Issue Links

          No reviews matched the request. Check your Options in the drop-down menu of this sections header.

            Activity

              People

              Assignee:
              You You Wang (Inactive)
              Reporter:
              You You Wang (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved: