Uploaded image for project: 'ONOS'
  1. ONOS
  2. ONOS-566

ONOS "stuck" when "push-test-intent" of 100000 intents

    XMLWordPrintable

    Details

    • Type: Bug
    • Status: Closed (View Workflow)
    • Priority: Critical
    • Resolution: Done
    • Affects Version/s: 1.1.0
    • Fix Version/s: 1.1.0
    • Component/s: None
    • Labels:
      None

      Description

      1) 7 ovs switches, linear topo;
      2) run following command:
      push-test-intents of:0000000000000001/1 of:0000000000000007/1 1000 100 1
      3) after a while (2~3 min), log stop recording (no exceptions) intent/flow info , all cpu load at >95%; karat console stuck;
      4) all ovs switch flow count stop increasing

        Attachments

        No reviews matched the request. Check your Options in the drop-down menu of this sections header.

          Activity

            People

            Assignee:
            bocon Brian O'Connor
            Reporter:
            suibin suibin
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved: