-
Type:
Bug
-
Status: Closed (View Workflow)
-
Priority:
Critical
-
Resolution: Done
-
Affects Version/s: 1.0.0
-
Fix Version/s: 1.1.0
-
Component/s: None
-
Labels:
-
Epic Link:
-
Sprint:Blackbird Sprint 2 (Jan 5-16), Blackbird Sprint 3 (jan19-30)
It is observed that when a chordal ring topology with 25 nodes & 300 links
(that would be 600 bi-directional links on ONOS) is loaded from Mininet,
ONOS topology does not converge at all. This issue observed on both single and multi-instance ONOS cluster. The topology converges quickly and reflects actual topology if ONOS is restarted using onos-service command. ONOS seem to run in to same issue again if the switches were un-assigned and assigned at Mininet even after the topology is properly converged.