Uploaded image for project: 'ONOS'
  1. ONOS
  2. ONOS-852

Intent install concurrency

    XMLWordPrintable

    Details

    • Type: Story
    • Status: Closed (View Workflow)
    • Priority: Critical
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: 1.1.0
    • Component/s: None
    • Labels:

      Description

      Modify IF to allow concurrent execution of intent installation when same AppID is use (i.e. when demo installer installing batch intents in a node, a single AppID is used - current intent framework will execute the installation in sequential threads.)

      An alternative (if IF is not the right place to make the improvement), demo installer should accommodate using some random AppID so as to demonstrate the concurrency.

        Attachments

          Issue Links

          No reviews matched the request. Check your Options in the drop-down menu of this sections header.

            Activity

              People

              Assignee:
              bocon Brian O'Connor
              Reporter:
              suibin suibin
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved: